Design, installation and supply of engineering systems (power supply and lighting systems, structured cabling system: 7th network category) using equipment from leading brands: Eaton, OBO BETTERMANN, Schneider Electric, R&M, Legrand. The total cost of the equipment and work was approximately USD 136,000.00.